Menu Bar

Home           Calendar           Topics          Just Charlestown          About Us

Thursday, October 22, 2026

Amtrak Rail Study Sets Wakefield Open House Nov. 4

Another session on the Charlestown Citizens Alliance's (CCA) top obsession

Adriana Vossari, RI & Local Government, is NOT an actual person but rather is an AI-bot used by UpriseRI to review and summarize public records. Click here for their explanation for how this is done: How we report meeting stories →

Charlestown, R.I. — Amtrak's study of rail capacity between New Haven and Providence will hold a public open house in Wakefield on Wednesday, Nov. 4, according to a notice posted by the Town of Charlestown. A second session is set for the next day in Groton, Conn.

The study will weigh new rail alignments or upgrades on the line ending in Providence, and Rhode Islanders can weigh in at a Wakefield open house on Nov. 4. Amtrak says no route has been chosen.

The Wakefield open house runs from 4:30 to 7:30 p.m. at South Kingstown High School, 215 Columbia St. The Groton session runs the same hours on Thursday, Nov. 5, at the Thrive55+ Active Living Center, the Groton Senior Center. Both are drop-in events, meaning residents can arrive any time during the window, and the town notice says the same information is shared at both.

EDITOR'S NOTE: Even though the so-called Old Saybrook-Kenyon Bypass was never a serious threat, as I explain HERE, and died in 2017, the CCA has repeatedly attempted to revive this issue each election cycle. The CCA has always run on fear by raising up some demon, often imaginary, and presenting themselves as the only protection Charlestown has. Kind of Trumpian even before Trump emerged on the scene. I have also gotten a little Trumpy by calling this obsession the Charlestown Choo-Choo Hoax. - Will Collette

Anyone who needs interpretation, translated materials or accessibility accommodations must ask by Monday, Oct. 26, by emailing info@newhavenprovidencestudy.com, according to the notice.

What the study is

Amtrak announced the New Haven to Providence Capacity Planning Study on July 7. In its release, Amtrak said the study will look at ways to preserve and increase the frequency, speed, reliability and resiliency of commuter and intercity rail between the two cities. It will identify and evaluate new alignments, improvements to existing lines, or both, define the capital investment needed, and produce a final report.

The study's FAQ says it "does not include a preconceived preferred alternative alignment or set of improvements." It also does not include detailed engineering, permitting, land acquisition, construction or NEPA review, the federal environmental review required before major projects move forward. Amtrak's release says any later improvements would need separate planning, design and environmental permitting.

The study area is wider than the two endpoint cities. According to the FAQ, it runs from New Haven east to New London, north to Hartford and northeast to Providence. It covers Amtrak, CTrail Shore Line East, the Hartford Line and MBTA Commuter Rail. Every alternative must start in New Haven and end in Providence.

The FAQ describes the line between New Haven and Providence as a primarily two-track railroad with little space left for added service, and it says movable bridges and grade crossings constrain speed and capacity.

The Rhode Island Department of Transportation is a partner on the study's agency advisory committee, alongside Connecticut DOT, Massachusetts DOT and the MBTA, the Federal Railroad Administration and the Northeast Corridor Commission. The FAQ says the work is funded by a Federal Railroad Administration Federal-State Partnership grant with matching funds from Amtrak. The study website says the work began in mid-2026 and will include approximately 24 months of work.

Why Charlestown is watching

The study traces back to a 2017 federal decision. According to the FAQ and an Amtrak letter, the 2017 NEC FUTURE Record of Decision removed a proposed segment between Old Saybrook, Conn., and Kenyon, R.I., and recommended this study instead.

Charlestown now has a seat in the process. In an Aug. 19 letter, Amtrak Executive Vice President Jennifer Mitchell invited Town Administrator Jeff Allen to join the study's Public Advisory Committee. The letter says the committee will have 10 to 15 members, meet quarterly over a roughly two-year study and attend three rounds of open houses. It says Amtrak drafted the candidate list with the Connecticut and Rhode Island transportation departments.

In a message posted by the town, Allen said he was selected for the committee and that its first meeting was scheduled for Oct. 14 in New London, Conn. He wrote that the seat will help bring Charlestown's perspective to the process and keep him informed.

The committee is advisory. The FAQ says it will provide guidance and input on alternatives and recommendations, and that the study team and its committees will aim to work on a consensus basis.

The Charlestown Citizens Alliance, a local advocacy group, has warned that the new study could again consider a bypass-like route. Amtrak says no preferred route has been chosen.

EDITOR'S NOTE: This marks the 5th straight election cycle where the CCA has attempted to drum up fear about this issue. 

What residents can do

Registration links for both open houses are listed on the town's notice. Residents can also comment, submit questions and sign up for updates through the project website, newhavenprovidencestudy.com. The next public step is the Wakefield open house on Nov. 4, with accommodation requests due Oct. 26.