Boost for fishing, tourism
The improvement project involved the construction of a new, double-lane, 60-foot wide pre-cast concrete boat ramp with two adjacent rows of floating docks. The project also included the elevation and expansion of the existing fixed pier walkway to provide access to the pier and floats for boaters with disabilities. The new double-lane system with added floats will greatly increase the efficiency and ease of use of the facility, and is expected to reduce wait times for users of this busy boat ramp.
